Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13636188

- Product Categories
- Friendly Links
- home > Supply > Generator maintenance on the diesel generator manufacturers _ (certified) _ Longgang generator maintenance
Generator maintenance on the diesel generator manufacturers _ (certified) _ Longgang generator maintenance
Information Name: | Generator maintenance on the diesel generator manufacturers _ (certified) _ Longgang generator maintenance |
Published: | 2015-01-14 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | When the generator generator rental Changping how to install the vibration motor vibration and the vibration plane roughness shall be mechanically connected to a 3.2 or higher, winding insulation, moisture should be used as the appropriate approach to 500V megger insulation resistance windings , near the operating temperature (70 ℃), should not be less than 0.38 megohms, or should be for drying. 2, the cable is intact, such as the occurrence of fracture damage should be replaced. 3, the body is intact, if damaged, please contact us for replacement. When the vibration motor is mounted on the vibration generator repair machinery manufacturers, vibration motor bolts must be tightened, spring washers must be added under each nut. Early vibration motor is running, due to the run-generator bolts, nuts China vibration, maintenance base planes, will reduce the tightening force, appeared little loose, so the initial stage of operation of the motor anchor bolts should be tightened several times, tight at the start of every day solid once again tightened after two weeks of weekly inspections. After installation place in the body and on the basis of all have cable clamping device where generator maintenance, cable suspended between the two was the natural state, with a total length of 300-500mm is appropriate, natural overhang curved arc radius When referring to the linear vibration device two vibration motors work simultaneously, you should check whether the two vibration motors turn opposite. Otherwise, one should change the motor power supply phase sequence, so that two vibration motors rotate in opposite directions, in order to ensure uniformity of the material. Long-term storage when not in use and storage of one, first by the project were not used in the short term. 2, remove the surface layer of dirt on the unit, the internal unit with compressed air to blow clean, filled with desiccant inside the generator, the generator will use thick paper cover, cover all vents and fasten with a rope. 3, the machine filter, air filter, etc. in the oil vent. 4, injected into each cylinder from the exhaust manifold 100 ~ 200g oil, the crankshaft is rotated ten times, so that the oil uniformly distributed in the cylinder, and the piston is at the compression top dead center. 5. Remove the valve cover, oil lubrication valve structure with dehydration. 6, the exhaust, air filter, fuel tank vent, cold starting device of the exhaust port and other oil paper seal. 7, the metal surface of the diesel engine, generator, coupling mouth, chassis and generator all parts, tools, accessories, scrub with detergent to clean where necessary butter. 8 month crank crank generator 1 to 2 times a repair company, after each crank shall make the piston is at top dead center on the compression. In order to ensure the normal use of diesel generators, recommendations, and the enterprises pay attention to routine maintenance at the same time, we can not ignore the storage and safekeeping work regularly for regular use and the use of diesel generators temporarily perform inspection, maintenance and prolong its service life . Generator maintenance on the diesel generator manufacturers _ (certified) _ Longgang generator repair provided by Electrical Equipment Co., Ltd., Dongguan ShangXi firewood. Electrical Equipment Co., Ltd., Dongguan ShangXi Chai (www.dongguanfadianji.cn) is an industry leader in Dongguan, Guangdong, diesel generator sets, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. On the diesel generator leadership with the staff warmly welcome all inquiries negotiations to create a better future for diesel generators. |
Admin>>>
You are the 20001 visitor
Copyright © GuangDong ICP No. 10089450, Electrical Equipment Co., Ltd., Dongguan ShangXi Chai All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 20001 visitor
Copyright © GuangDong ICP No. 10089450, Electrical Equipment Co., Ltd., Dongguan ShangXi Chai All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility